Link

Social

Embed

Disable autoplay on embedded content?

Download

Download
Download Transcript

[00:00:01]

AND CALLED THE REGULAR MEETING OF THE RECREATION ADVISORY BOARD.

[CALL TO ORDER]

2020 507 TO ORDER. CAN I HAVE A ROLL CALL, PLEASE? TOM BAUM PRESENT. ALFREDA. GARY. PRESENT. WOODSON.

FENELON. PRESENT. JOSHUA. FRISBIE. PRESENT. AND WE HAVE A QUORUM.

[ADOPTION OF MINUTES]

ADOPTION OF MINUTES FROM THE MAY 6TH MEETING.

I NEED A MOTION. SO WE DON'T HAVE COPIES OF THOSE.

WE'LL MOVE THEM TO THE NEXT AGENDA. OKAY. SO THAT WILL BE TABLED TO THE NEXT ITEM OR THE NEXT MEETING.

EXCUSE ME. WE HAVE NO MEMBERS OF THE PUBLIC PRESENT, SO THERE WILL BE NO PUBLIC COMMENT.

[NEW BUSINESS]

NEW BUSINESS, FRED POPPY REGIONAL PARK, MASTER PLAN UPDATE, GENTLEMEN.

ALL RIGHT, SO WHAT YOU HAVE IN FRONT OF YOU AND ON THE SCREENS IS A DRAFT OF THE FRED POPPY REGIONAL PARK MASTER PLAN. THIS WAS DONE UTILIZING IMPACT FEES IN OUR CONSULTANT AS KIMLEY-HORN.

SO WHAT WE WANTED TO GO THROUGH WITH YOU WAS TO GUIDE YOU THROUGH THIS PLAN.

AND THEN AT THE END OF IT, WE WANTED TO TAKE YOUR REMARKS AND COMMENTS AND ADD THOSE INTO OUR NOTES TO BE PRESENTED TO KIMLEY-HORN.

AND THEN ONCE THEY RECEIVE ALL THAT, THEY WILL GIVE US THE FINAL VERSION, AS WELL AS CONSTRUCTION COSTS FOR EVERYTHING AS WELL.

SO WE'LL HAVE A WHOLE PLAN FINALIZED THAT WE'LL BE ABLE TO BRING BACK TO THE RAB AND THE COUNCIL.

SO I'M GOING TO KIND OF MOVE LEFT TO RIGHT DOWN AND UP HERE ON THE MAP, JUST SO IT COULD BE BLOWN UP ON THE SCREEN FOR YOU.

SO STARTING ON THE SOUTHEAST SIDE HERE. THESE ARE WHERE THE EXISTING SOCCER FIELDS AND PRACTICE FIELDS ARE.

AS YOU SEE THEY ADDED THE PARKING LOTS HERE. AND THAT WAS SOMETHING THAT WAS BROUGHT UP BY COUNCILMAN HAMMER AT ONE OF THE COUNCIL MEETINGS.

SO THEY TOOK THAT INTO CONSIDERATION TO EXPAND PARKING FOR THE SOCCER AREA HERE.

AS WE MOVE UP WHAT YOU SEE HERE, AND YOU'RE GOING TO SEE THIS THROUGHOUT THE MAP, THE EXISTING PONDS AND THE POTENTIAL POND EXPANSIONS. THOSE POND EXPANSIONS WILL ONLY HAPPEN IF NEEDED AS WE DEVELOP.

SO THE MEASUREMENTS ON THEM ARE NOT TO SCALE.

THIS IS JUST A ROUGH DRAFT OF WHAT IT WILL LOOK LIKE IF WE WERE TO BE FULLY DEVELOPED IN THE PARK AND THEN MOVING TO THE NORTH HERE. THERE'S SOME ADDED PARKING HERE FOR THE YOUTH PRACTICE FIELDS AND THE SOFTBALL FIELDS.

AND THEN THE EXISTING BASEBALL FIELDS. JOSH, IF YOU WANT TO GO ON THE PROPOSED IMPROVEMENTS FOR THOSE.

SO FOR THE MULTI-USE FIELDS. SO THE BASEBALL FIELDS, WE'RE GOING TO REALLOCATE THE THE EXISTING PROPERTY THAT'S THERE.

SO WE'RE GOING TO IMPROVE THE DRAINAGE THAT, THAT WE'RE HAVING ISSUES WITH ON THE FIELDS THAT ARE CURRENTLY TURF THE OUT FIELDS INTO A BERMUDA ATHLETIC TURF AND UTILIZE THE SPACE THAT'S OUT THERE FOR MULTI-PURPOSE, FOR POTENTIAL LACROSSE, SOCCER, FLAG FOOTBALL, FOOTBALL. SO AND ALSO HERE JUST TO THE NORTH OF THAT WE HAVE WHERE THE NEW ENTRANCE ENTRANCES FOR THE BRIDGE AND THEN THE NEW PROPOSED EXISTING ROAD COMING IN.

THEY DO HAVE ON THIS DRAFT A ROUNDABOUT COMING IN WHICH WILL ALL BE FDOT COMPLIANT.

THEN A BIG FOCUS HERE IS THE CENTER WHICH A LOT OF OUR ACTIVITY IN THE PARK HAPPENS IN THE CENTER HERE.

SO THE EXISTING CRICKET FIELD WILL REMAIN THERE.

IF YOU SEE TO THE SOUTH HERE, H RIGHT NOW THERE'S EXISTING BASKETBALL COURTS.

THERE'S A LOT OF SPACE OUT THERE. SO WE ARE GOING TO EXPAND THAT TO TWO EXISTING BASKETBALL COURTS.

AND WE'RE ALSO GOING TO ADD ALMOST LIKE A GRAVEL LIKE PARKING THERE.

SO THAT WAY THEY DON'T HAVE TO PARK ACROSS AND WALK ACROSS THE ROAD.

THEY'LL BE ABLE TO PULL IN FOR BASKETBALL. THEN HERE WE HAVE OUR EXISTING SPORTS COURTS.

ONE IS A SAND VOLLEYBALL. THE OTHER IS THE TWO FULL COURT BASKETBALLS THAT ARE OUT THERE AS WELL.

[00:05:02]

AND I'LL GET A LITTLE MORE INTO, YOU KNOW, WHAT OUR THOUGHTS ARE ON THIS AREA.

AND THEN A IS THE AMPHITHEATER. WE'RE LOOKING AT UTILIZING THE SAME SPACE THAT WE USE FOR EVENTS CURRENTLY.

BUT ADDING A STRUCTURE THERE. NOW WE HAVE A PERMANENT SETUP.

THESE LITTLE ORANGE RECTANGLE BLOCKS, WHAT THOSE ARE, ARE TO CREATE SOME DRIVING WAYS THROUGH THE EVENT AREA.

THAT WAY, WE DON'T HAVE VENDORS GOING ON TO THE EVENT SPACE RUNNING UP THE FIELD.

THIS WAY, THERE'S JUST A LITTLE MORE ORDER, SO WE COULD SAVE THAT FIELD BECAUSE, AS YOU KNOW, OVER TIME, THE COMPACTION OUT THERE IS CREATED SOME FLOODING ISSUES DURING OUR EVENT.

SO THIS WILL ALLEVIATE A LOT OF THE TRAFFIC OFF THAT FIELD.

AND THEN. I'LL START HERE AT THE NORTHWEST, AND THEN WE'LL GET INTO THE PICKLEBALL.

SO, NORTHWEST. THIS IS THE PENITENTIAL POND. THIS HAS TO DO WITH US IN TAKING A LOT OF THAT STORM WATER.

FROM SAINT JOHN'S HERITAGE PARKWAY. MOVING SOUTH.

EXISTING SCOUT PAVILION AND EXISTING RESTROOMS WILL REMAIN.

WE'RE GOING TO HAVE AN AREA OUT HERE WITH GREEN SPACE THAT WE COULD USE AS POTENTIAL MULTI-PURPOSE FIELD AS WELL.

SO THAT WAY WE AS ACTIVITIES INCREASE, WE COULD EXPAND OUR USAGE IN THE PARK.

AND THEN WE HAVE EXISTING PARK FUTURE PARKING BEING ADDED HERE RIGHT OFF THE MAIN ROAD.

THIS PARKING IS GOING TO HAVE A DUAL MULTI-USE WITH THE EVENT AREA.

SCOUT PAVILION, A MULTI-PURPOSE FIELD DOG PARK IS STILL GOING TO HAVE ITS PARKING RIGHT THERE ALONG.

AND THEN WE GOT SOME PARKING TO THE EAST HERE.

WHICH BRINGS US INTO THE PICKLEBALL COMPLEX. WHAT THE PLAN OR VISION IS TO HAVE IN PHASE ONE 16 PICKLEBALL ONLY COURTS IN THAT AREA.

RIGHT. ON THIS DRAFT, IT DOES SAY 16 COURTS AND EIGHT TENNIS COURTS.

BUT RIGHT NOW, PHASE ONE IS JUST GOING TO BE 16 LINE PICKLEBALL COURTS.

PHASE TWO, WHEN WE GET INTO THAT, WE'RE GOING TO HAVE LOTS OF DISCUSSIONS ON ARE WE GOING TO USE MULTI-USE COURTS WITH TENNIS AND PICKLEBALL, OR ARE WE GOING TO GO PICKLEBALL ONLY? OUR PLAN IS TO APPROACH THE TDC FOR SOME FUNDING ON THIS.

PROFESSIONAL PICKLEBALL ASSOCIATION HAS INTEREST IN THIS PROJECT AS WELL.

I SPOKE TO THEIR VICE PRESIDENT OF THEIR TOURNAMENTS SO THEY'RE AWARE OF WHAT'S GOING ON.

AND THERE'S ALSO PLANS FOR A PICKLEBALL CLUBHOUSE, WHICH IS E, AND THEN F IS GOING TO BE COVERED COURTS RIGHT NOW AFTER TALKING TO A PROFESSIONAL PICKLEBALL ASSOCIATION.

THEY WOULD REQUIRE AT LEAST A MINIMUM OF TWO COVERED COURTS AND BLEACHERS THAT COULD HOLD A MINIMUM 500 VIEWERS, WHICH JOSH AND I HAVE DISCUSSED USING OUR PORTABLE BLEACHERS BECAUSE EACH ONE OF THOSE HOLDS ABOUT 250.

SO WE'LL DESIGN THIS WHERE WE COULD UTILIZE OUR PORTABLE BLEACHERS TO BRING ON THERE.

AND I WILL LEAVE IT TO YOU GUYS WITH MORE QUESTIONS AND A LOT OF THE FIELD AND TECHNICAL STUFF JOSH WILL BE ABLE TO ANSWER.

SO ONE OF THE ONE OF THE MAIN THINGS I GOT IS THAT GREEN SPACE THAT GREEN SPACE BEHIND THE BUILDING, THE I KNOW YOU'RE GOING TO IMPROVE IT AND YOU'RE GOING TO PUT THAT DRIVEWAY AROUND IT FOR THE VENDORS, BUT ARE WE GOING TO BE GRADING THAT, GETTING THAT, THAT PROPERTY GRADED PROPERLY FOR THE DRAINAGE BECAUSE THAT'S THAT'S CRITICAL BACK THERE. YEAH. YES. THAT'D BE PART OF THE PLAN IF YOU'VE GONE OUT THERE RECENTLY, WE'VE BEEN UTILIZING SOME EXTRA DIRT THAT WE'VE HAD FROM THE POND REMOVALS THE PUT IN BACK THERE.

SO WE'VE ALREADY STARTING TO ADD FILL IN THERE FOR SOME LOWER AREAS.

BUT ABSOLUTELY DID. WHEN WE DO AN EVENT SITE OUT THERE, DRAINAGE WILL BE IN CONSIDERATION.

OKAY. YEAH. THANK YOU. JIM. ONE QUESTION I HAD WAS, WELL, I ACTUALLY HAVE TWO, BUT THEY'RE BOTH TIED TOGETHER.

ONE IS THE ROADS GOING AROUND THE PARK. WE NEED TO FIGURE OUT HOW TO FIND TWO.

IF NOT IMPROVE, AT LEAST MAINTAIN THOSE ROADS.

[00:10:01]

WHETHER THAT COME FROM PUBLIC WORKS, INFRASTRUCTURE, MONEY OR COMES FROM PARKS FACILITIES.

BUT IT JUST KEEPS GETTING WORSE YEAR AFTER YEAR.

AND AT SOME POINT, YOU'RE GOING TO HAVE TO DO A FULL DEPTH RECLAMATION AND BUILD A WHOLE NEW ROAD INSIDE THAT PARK WHERE WE'RE AWARE OF THE ROADS AND THE CONDITION.

I HAVE A BUDGETARY REQUEST FOR THAT ROAD. IT'S JUST IT'S IT'S A BUDGETARY REQUEST.

SO WE'RE WE'RE WE'RE MONITORING IT. AND IT HAS BEEN DISCUSSED IN INTERNAL CONVERSATIONS.

I KNOW THAT THE LIKE YOU SAID, THE MAP'S NOT TO SCALE, AND I'M SURE THEY'RE THERE, BUT NOT SHOWN IS BICYCLE PATHS IN AND OUT OF THE PARK AND AROUND THE PARK. NOT ONLY BICYCLE PATHS, BUT IF YOU IF YOU SEE THE YELLOW LINES ALL AROUND THAT WHOLE MAP THERE, PASS A LOT OF THAT SIDEWALK. OKAY. LOOK AT SOME OF THE SQUIGGLY LINES GOING THROUGH THE WOODS.

THOSE ARE ADDITIONAL PATHS. AND WE DID HAVE DISCUSSIONS WITH KIMLEY-HORN ABOUT THE ROADS THERE.

WIDENING THEM ARE GOING TO BE PRETTY HARD TO DO AND COSTLY.

SO ONE OF THE THINGS THAT WE DISCUSSED WAS BEING ABLE TO BE BIKE FRIENDLY, PAINT DOWN THE SHARE OF THE ROADS, PUT UP SOME SIGNAGE AROUND THAT. BIKES ARE SHARING THE ROAD AS WELL, RIGHT? AND WHEN WE'RE PUTTING IN SIDEWALKS, PUT IN WIDE SIDEWALKS.

SO, I MEAN, I PREFER TO USE THE SIDEWALK TO BE IN ON THE ROAD.

ANYBODY ELSE? DANIEL, I BELIEVE THE EIGHT FOOT SIDEWALKS IS SHARED USE.

YEP. RIGHT. I JUST HAVE ONE QUICK QUESTION. SO I KNOW CURRENTLY THE PALM BAY LEAGUES FOR LIKE, FOOTBALL AND STUFF LIKE THAT. THEY PLAY AT BAYSIDE.

AND I KNOW THAT YOU HAVE TO PAY TO GO WATCH YOUR KID PLAY.

IS IS THERE FUTURE PLANS FOR THEM TO PLAY HERE, LIKE IN THOSE PROPOSED BASEBALL FIELDS AND STUFF? SO PART OF THE MULTIPURPOSE FIELDS OUT THERE WOULD WOULD OPEN THAT UP FOR POTENTIAL.

THE THE REASON THAT THEY CAN'T PLAY OUT THERE CURRENTLY IS BECAUSE THEY WOULD HAVE TO USE THE SOCCER FIELDS, WHICH THE SOCCER FIELDS ARE. THE FIRST RIGHT OF THE SECOND RIGHT OF USE ON THE SOCCER FIELDS IS BSA.

AND THEY PRETTY MUCH PLAY YEAR ROUND. SO LIGHT IT FIELDS.

LIT FIELDS IS WHAT WE NEED. THANK YOU.

[REPORTS]

OKAY. WE'LL MOVE ON THEN TO REPORTS JOSH. SO WE'VE WE'VE BEEN PRETTY BUSY SINCE THE LAST TIME WE MET.

ONE OF THE THINGS THAT WE DID WHILE WE WERE WAITING FOR THE CDBG FUNDING TO COME IN IS WE REPAINT IT, RESEALED AND REPAINTED ALL THE BUILDINGS OUT AT REGIONAL WITH THE EXCEPTION OF PWC.

SO ALL THE ALL THE CONCESSION STANDS, BATHROOMS ALL THE BATHROOMS GOT PAINTED INSIDE AND OUT.

CONCESSION STANDS GOT PAID IN OUTSIDE. ALL THE ALL THE SPLIT FACE BLOCK OUT THERE GOT SEALED WITH ALL THE PARKING LOTS, GOT STRIPED ALL THE PARKING CURBS GOT PAINTED.

CRICKET GOT NEW MALTS. WE REALLY SPENT A LOT OF TIME OUT REGIONAL DOING SOME WELL NEEDED MAINTENANCE.

WE ALSO RESPRAY THE METS GAME FIELD, SO WE WE NUKED ALL THE GRASS OUT OF THAT GAME FIELD, DID SOME GRADING, ADDED TEN LOADS OF DIRT TO GET A LITTLE BIT MORE OF A CROWN ON THAT FIELD AND RESPECT IT WITH BERMUDA.

THE WE REPAINTED LYNBROOK PARK. IF YOU GUYS HAVEN'T BEEN TO PARK, IT GOT RE STRIPED.

ALL THE CRIBBING GOT PAINTED, THE BATHROOMS GOT PAINTED, DUGOUTS HAD THE REPAIRS DONE TO IT.

IT LOOKS REALLY GOOD OUT THERE. MOVING ON TO CDBG PROJECTS.

THE LED THIS IS FOR THE FISCAL YEAR 25 CDBG MONEY.

THE LED BASKETBALL UPGRADE LIGHTS WERE COMPLETED.

THEY'RE COMPLETED THIS WEEK. PARKS HAS REMOVED ALL THE FENCING ON ALL FOUR SOFTBALL FIELDS, BACKSTOPS AND ALL THE OUTFIELD FENCING. THE OUTFIELD FENCING FROM DUGOUT TO DUGOUT ON THE OUTSIDE.

THE POS AND PROCESS. THE MATERIALS ARE ON ORDER.

THE BACKSTOP FENCING. THE CONTRACTOR STARTED YESTERDAY PUTTING UP NEW BACKSTOPS.

ALL OF THE CLAY FROM ALL FOUR FIELDS HAVE BEEN REMOVED.

WE HAD A BIG HELP FROM PUBLIC WORKS. THEY BROUGHT OUT SOME BIG MACHINES.

SAVED US A LOT OF TIME. REMOVED ALL THE CLAY.

WE HAVE STOCKPILED THE CLAY AND WE'RE REPURPOSING IT.

ONE OF THE THINGS THAT WE'RE DOING TO REPURPOSE THAT CLAY IS WE'RE PUTTING WARNING TRACKS IN ON THE OUTFIELD.

SO ALL FOUR FIELDS OF LIBERTY NOW HAVE A TEN FOOT WARNING TRACK.

ONCE WE ONCE WE MOVE OUT OF THAT PROJECT, WE'LL BE ABLE TO START PUTTING WARNING TRACKS ON OUR OTHER FIELDS.

WE PLAN ON DOING FIELD THREE AND NUNGESSER AT MINIMUM.

WE ALSO HAVE PLANS TO UTILIZE SOME OF THAT CLAY TO EXPAND FIELD FOR OUT AT CONNECT TO 90 FOOT BASIS.

[00:15:04]

THEY THEY'RE TRYING TO BRING IN TOURNAMENT PLAY AND THEY NEED ANOTHER ANOTHER BIG FIELD.

SO THEY'LL THEY'LL HAVE A PORTABLE PITCHING MOUND THAT THEY'LL BRING IN, AND WE'LL EXPAND THE BASES OUT AND MAKE IT SAFE TO PLAY FOR THEM TO DO TOURNAMENTS.

THE BATHROOMS OUT AT LIBERTY ARE BEING REMODELED.

THE BATHROOMS CURRENTLY OUT AT THE SOFTBALL FIELDS ARE HAVING TO BE PUT UP.

ALL NEW FIXTURES PARTITIONS, LIGHTS. I THINK THEY'RE ABOUT HALFWAY DONE WITH THE ONES THERE.

AND ONCE THEY'RE DONE WITH THOSE, WE'LL MOVE OVER TO THE BASKETBALL COURTS, PLAYGROUND AREA.

AND THEN THE FINAL PART OF LIBERTY IS WE'RE GOING TO REPLACE ALL THE CONCRETE WE ARE NOT ABLE TO REPLACE IN 2023 CDBG FUNDS. SO WE'VE GOT FOUR INCH CONCRETE OUT THERE THAT'S CRACKING AND FAILING.

AND WE'LL REPLACE IT WITH SIX INCH CONCRETE. AND THEN THE FINAL THING I HAVE IS THE PLAYGROUND, PLAYGROUND FENCE AT REGIONAL PARK. THE POA HAS BEEN PROCESSED.

WE'RE WAITING FOR MATERIALS TO COME IN. SO WE'LL BE PUTTING A FOUR FOOT VINYL FENCE.

THAT'S PSM COMPLIANT FOR PLAYGROUNDS. OKAY. THANK YOU.

ANY QUESTIONS? DANIEL. ALL RIGHT. SO MY UPDATES FOR YOU.

FOR RECREATION WE IT IS SUMMERTIME, SO SUMMER CAMPS ARE IN FULL FORCE.

JUST TO GIVE YOU GUYS AN UPDATE ON THE NUMBERS.

OUR TONY ROSA COMMUNITY CENTER WHICH WE ARE RUNNING THE CAMP IN HOUSE.

THERE WE ARE, RIGHT AROUND 80 REGISTRANTS A WEEK.

AND ABOUT 70 ARE ATTENDING PER WEEK. AND OVER AT TED WHITLOCK, WHICH THE YMCA IS RUNNING SUMMER CAMP.

THERE THEY ARE AT ABOUT 70 REGISTRANTS PER WEEK AND ABOUT 60 ATTENDING, WHICH IS THE AVERAGES ARE MEETING UP WITH LAST YEAR'S PARTICIPATION AS WELL FOR BOTH CAMPS. CAN WE CAN WE GET A SURVEY AFTER THAT'S OVER? AFTER THE CAMP'S OVER. SURVEY THE PARENTS? YEP.

I'D REALLY LIKE TO GET SOME FEEDBACK ON THAT BECAUSE I, I, I THINK IT'S A GOOD PROGRAM, I THINK.

YOU KNOW, YOU SEEM TO INDICATE THEY GIVE OUT A LOT OF UPTAKE.

YEAH. I, I MEAN, I COULD TELL YOU JUST MY FEEDBACK I'M GETTING FROM THE YMCA CAMP.

THE PARENTS ARE VERY HAPPY. OUR CAMP AS WELL.

SO BOTH ARE DOING WELL. I HAVEN'T REALLY A LOT OF NO COMPLAINTS THIS SUMMER HAVE COME ACROSS MY DESK AT LEAST.

SO THAT'S GOOD NEWS. AND THEN THE AQUATIC CENTER PRETTY MUCH ON THE WEEKENDS, THEY'RE AT CAPACITY WITH OPEN SWIM DURING THE WEEK. THIS SUMMER, WE DID ADD A LOT MORE SWIM LESSONS, AND ALL OF OUR SWIM LESSONS ARE SOLD OUT.

SO ONE QUESTION ON THE AQUATICS CENTER. YES. YOU GUYS ARE AWARE OF WHAT HAPPENS AT THE MINECRAFT MOVIE, RIGHT? YES. AND YOU'RE HAVING THAT AT THE POOL? YES. OKAY. THANK YOU. YES. WE ARE. AND THEN OF COURSE, THIS SATURDAY, OUR INDEPENDENCE DAY CELEBRATION.

I KNOW THERE'S CONCERNS ABOUT THE WEATHER. BUT I'VE TALKED TO THE FIREWORK CONTRACTOR AND AT LEAST THE FIREWORKS SHOW.

WE'RE GOING TO GO RAIN OR SHINE, UNLESS THERE IS A TORRENTIAL DOWNPOUR.

SO I'M WORKING IN A HOUSE WITH MULTIPLE DEPARTMENTS.

TO COME UP WITH A PLAN. IF THAT DOES HAPPEN THE DAY OF SO AND THAT MESSAGING OUR PIO AND AND ANDY, WHO DOES THE RECREATION SOCIAL MEDIA WILL GET ALL THAT INFORMATION OUT RIGHT AWAY.

SO BUT RIGHT NOW, WE'RE PLANNED AS A GO. AND THAT'S IT FOR ME.

ANY QUESTIONS? ANYBODY HAVE ANYTHING THEY WANT FOR THE NEXT MEETING? OH, I HAVE I DO HAVE SOMETHING BECAUSE I HAD A CONVERSATION WITH THE MAYOR.

IN FRONT OF THE NEW BUILDING. E HERE. AS YOU'RE LEAVING OR AS YOU PASS BY CITY HALL, NOTICE BETWEEN THE PARK AND THE BUILDING, THEY HAD TO BUILD A. REALLY NICE WALL. THAT RETENTION WALL.

AND EVERY TIME I DRIVE BY IT, I THINK IT SHOULD BE USED FOR SOMETHING.

I MEAN, IT COULD REALLY MAKE A STRONG A STRONG MESSAGE.

AND SO AS SOON AS I BROUGHT THAT TO THE MAYOR'S ATTENTION, HE THREW IT BACK AT MY LAP AND SAID, WELL, WHY DON'T YOU TAKE IT TO THE RECREATION BOARD? SO WHEN YOU DRIVE BY THERE, LOOK AT IT.

[00:20:02]

THINK ABOUT IT. SEE IF WE CAN COME UP WITH SOME IDEAS.

YEAH. YEAH, I NEVER NOTICED IT, BUT ANYTHING, ANYTHING.

YOU CAN TURN YOUR HAND AND MAKE FASHION. YEAH, I MEAN, IT'S I MEAN, ONCE YOU LOOK AT IT IN THAT LIGHT, YOU CAN'T UNSEE IT. SO. OKAY. ANYBODY ELSE SEEING NOTHING AT 624? I'LL CALL THE MEETING ADJOURNED. THANK YOU. GENTLEMEN.

THANK YOU. THANK YOU. OKAY.

* This transcript was compiled from uncorrected Closed Captioning.