*1. Preliminary design investigation for proposed upgrades, North Regional Wastewater Treatment Plant – TO 01-2019-002 – Utilities Department (Tetra Tech, Inc. - $59,695).
2. Engineering services during construction, South Regional Water Reclamation Facility – TO 20-05 – Utilities Department (Wade Trim - $1,896,353).
*1. Preliminary design investigation for proposed upgrades, North Regional Wastewater Treatment Plant – TO 01-2019-002 – Utilities Department (Tetra Tech, Inc. - $59,695).
2. Engineering services during construction, South Regional Water Reclamation Facility – TO 20-05 – Utilities Department (Wade Trim - $1,896,353).